In this area after analyzing the storage needs of customer, the most efficient operation is organized. Various possibilities are offered to our customers with storage management or with the options to create a project-specific Warehouse in our customer’s own warehouse or in our own warehouses.
First stage is to determine the storage area. After determining the location of the warehouse the next step is the creation of its design and installation. Afterwards, work on the development of the system is started. There are many systematic works carried out such as goods receipt and developing the stock entry, by receiving dispatch orders and analyzing it preparing the dispatch note and invoice, making the cargo out of the stock decrease from the stock and presenting the stock level to the customer’s information with the developed special reports. Within all these operations, “operation-specific machines” are used for packaging, handling, loading/unloading, depending on the type of product, and applications can be developed.